亚洲综合一区二区三区无码-亚洲码欧美码一区二区三区-亚洲蜜桃精久久久久久久久久久久-亚洲日韩一区二区一无码-javaparsae人妻xxx-国产精品毛片无遮挡-91嫩草国产在线观看免费无码-国产欧美日韩免费看aⅴ视频-免费无码又爽又刺激高潮久久-美女裸体黄网站18禁免费站无遮挡-亚洲成av人片在线看片,国产av蜜芽一区二区三区,国产欧美日韩在线高清,jizz日本zzz日本护士多水

Language:CHINESESENGLISH

Home > News > How to ensure the completion of steel structure project on time
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sdjianmu.com

How to ensure the completion of steel structure project on time

Time:[2016-11-9]  Hits:5679

   The construction of a steel structure, completed within the specified period is a commitment to the enterprise, but to ensure the completion of this task, it must not be a good commander. So today by the Guangzhou Steel Company commander to share with you more.
       1, in the construction of the total duration as the goal to stage control plan to ensure the use of effective internal and external conditions for enterprises to take dynamic management to make the construction of a scientific and rational organization to ensure that the plan on schedule or ahead of schedule.
        2, fully prepared before the start of the preparatory work.
        3, conscientiously do a good job in the drawings of the trial work will be found in the technical settlement to resolve, to avoid the construction due to design changes and delay the construction period, the timely preparation of practical construction design and construction of major sub-project construction design for continuous construction operations to provide reliable guarantee .
        4, daily production scheduling meeting, daily inspection, if any delay by increasing labor force measures in time to solve the human, machinery, material supply and other problems timely coordination by the company to solve.
       5, the last is the most important, internal and external communication and coordination.
      How to ensure that steel works completed on schedule, the above is given today to share. Want to learn more, Shengbang Guangzhou Steel Structure Company welcomes you!
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)