亚洲综合一区二区三区无码-亚洲码欧美码一区二区三区-亚洲蜜桃精久久久久久久久久久久-亚洲日韩一区二区一无码-javaparsae人妻xxx-国产精品毛片无遮挡-91嫩草国产在线观看免费无码-国产欧美日韩免费看aⅴ视频-免费无码又爽又刺激高潮久久-美女裸体黄网站18禁免费站无遮挡-亚洲成av人片在线看片,国产av蜜芽一区二区三区,国产欧美日韩在线高清,jizz日本zzz日本护士多水

Language:CHINESESENGLISH

Home > News > construction steel structure fire regulations
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sdjianmu.com

construction steel structure fire regulations

Time:[2016-1-27]  Hits:5267

Guangzhou Steel tells you: construction steel structure fire regulations


1. Guangzhou fireproof coating protected by trained and qualified construction professional construction team. Construction of security technology and labor protection requirements, should be the existing relevant provisions of the state.
2. When the steel structure in place, the boom connected thereto, a horse track, pipe racks and other related components even installed, and after passing the acceptance, before proceeding fireproof coating.
3. Before construction, steel surfaces should be rust, and determine in accordance with the requirements of anti-rust treatment. Rust and rust treatment should comply with "Steel Construction and acceptance norms" in the relevant provisions.
4. steel surface debris should be cleaned, cracks or other fire use fire-resistant coating material which is connected at the block level before construction fill.
5. fire retardant coating construction should be carried out before the next interior decoration and are not damaged by the subsequent engineering conditions. When construction on the site and other objects need for fire protection shielding should be protected, just construction coating should prevent dirty fluid contamination and mechanical shocks.
6. Before the construction process and the coating is dried and solidified, the ambient temperature should be maintained at 5 ~ 38 ℃, relative humidity not more than 90%, the air should circulate. When the wind speed is greater than 5m / s, or rain and member surface condensation, not a job.

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號