亚洲综合一区二区三区无码-亚洲码欧美码一区二区三区-亚洲蜜桃精久久久久久久久久久久-亚洲日韩一区二区一无码-javaparsae人妻xxx-国产精品毛片无遮挡-91嫩草国产在线观看免费无码-国产欧美日韩免费看aⅴ视频-免费无码又爽又刺激高潮久久-美女裸体黄网站18禁免费站无遮挡-亚洲成av人片在线看片,国产av蜜芽一区二区三区,国产欧美日韩在线高清,jizz日本zzz日本护士多水

Language:CHINESESENGLISH

Home > News > Seismic structure of multi-layer steel plant which measures
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sdjianmu.com

Seismic structure of multi-layer steel plant which measures

Time:[2015-11-28]  Hits:5642

Seismic structure of multi-layer steel plant which measures

Steel framework supports the connection of multi-layer steel plant of high strength can be welded or bolted. Guangzhou Steel

Plant arranged between longitudinal column support should be consistent with the following requirements:

Support should be set between the longitudinal column column column near the middle;

Support may be provided between the longitudinal column in the same bay, and down through the room with a pillar;

Between the roof and the top transverse horizontal support column support, should be provided in the same column between the ends of the plant unit; when the plant unit is long, between three to five column should be set together every.

Pin frame when each horizontal stiffness difference between the larger, when the vertical support without rules, in accordance with Table 6.2.1 of the level of support required to set floors, its construction should fit the following rules:

The level of support may be provided in the second bottom of the beam, but should also support rod end is connected to the floor longitudinal beam web and lower flange beams;

Floor level of support should be arranged in coordination with the vertical support orientation;

Beam axis can be floor level as the chord support system, diagonals and chord angle between 30 ° ~ 60 °; Guangzhou Steel

When the column grid mesh area within the secondary beam to accept large equipment load, should be added to the rigid tie rod, the earthquake reached the level of support equipment gravity chord nodes (beam axis), or.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號