亚洲综合一区二区三区无码-亚洲码欧美码一区二区三区-亚洲蜜桃精久久久久久久久久久久-亚洲日韩一区二区一无码-javaparsae人妻xxx-国产精品毛片无遮挡-91嫩草国产在线观看免费无码-国产欧美日韩免费看aⅴ视频-免费无码又爽又刺激高潮久久-美女裸体黄网站18禁免费站无遮挡-亚洲成av人片在线看片,国产av蜜芽一区二区三区,国产欧美日韩在线高清,jizz日本zzz日本护士多水

Language:CHINESESENGLISH

Home > News > steel girder segment energy dissipation structure connected column which requests?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sdjianmu.com

steel girder segment energy dissipation structure connected column which requests?

Time:[2015-10-31]  Hits:4916

Guangzhou Steel tells you: steel girder segment energy dissipation structure connected column which requests?


Link beam connection with a rigid frame column nodes, connected with the general framework slightly different pillars.
When energy beams and column connections, its length should not be greater than 1.6M1p / Vb, energy beams between the flange and the webs between the link beam and column flange or flange (when link beam and column web connections) should selection groove full penetration butt welds, fillet welds should be used between the web and post-energy beams instead of bolting, due to slip the bolts will affect the ductility and energy dissipation capacity.
Carrying Capacity of fillet welds shall not be less than the axial bearing capacity web link beam, shear capacity and flexural capacity. Guangzhou Steel

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號