亚洲综合一区二区三区无码-亚洲码欧美码一区二区三区-亚洲蜜桃精久久久久久久久久久久-亚洲日韩一区二区一无码-javaparsae人妻xxx-国产精品毛片无遮挡-91嫩草国产在线观看免费无码-国产欧美日韩免费看aⅴ视频-免费无码又爽又刺激高潮久久-美女裸体黄网站18禁免费站无遮挡-亚洲成av人片在线看片,国产av蜜芽一区二区三区,国产欧美日韩在线高清,jizz日本zzz日本护士多水

Language:CHINESESENGLISH

Home > News > Foshan Steel: General provisions hoisting steel construction zone safety
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sdjianmu.com

Foshan Steel: General provisions hoisting steel construction zone safety

Time:[2015-1-14]  Hits:6110

Foshan Steel: General provisions hoisting steel construction zone safety

1, lifting the region should set the security cordon, non-operating personnel is prohibited from entering.
2, lifting objects hanging from the ground 200mm ~ 300mm, should conduct a comprehensive inspection, and after the official confirmation should be lifting.
3, when the wind speed reaches 10m / s, should stop lifting operations; when the wind speed reaches 15m / s, not lifting operations.
4, high-altitude use small hand tools and small parts of measures should be taken to avoid falling.
5, the construction of electricity should be consistent with the current industry standard "construction site temporary electrical safety technical specifications" of the relevant provisions of JGJ46.
6, the construction site should be professionals responsible for the installation, maintenance and management of electrical equipment and power lines.
7, a day hanging on to the floor or roof components not finished when installed, should take firm measures to temporarily fixed.
8, the pressure plate surface water, ice, frost or snow, they should be promptly removed and shall take appropriate measures to protect non-slip.

Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)