亚洲综合一区二区三区无码-亚洲码欧美码一区二区三区-亚洲蜜桃精久久久久久久久久久久-亚洲日韩一区二区一无码-javaparsae人妻xxx-国产精品毛片无遮挡-91嫩草国产在线观看免费无码-国产欧美日韩免费看aⅴ视频-免费无码又爽又刺激高潮久久-美女裸体黄网站18禁免费站无遮挡-亚洲成av人片在线看片,国产av蜜芽一区二区三区,国产欧美日韩在线高清,jizz日本zzz日本护士多水

Language:CHINESESENGLISH

Home > News > Inspection and appraisal of steel structure workshop
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.sdjianmu.com

Inspection and appraisal of steel structure workshop

Time:[2022-11-5]  Hits:2242

The factory is a place where benefits are created, and the safety needs of the factory are highly valued. If the factory has quality problems, it will not only pollute the environment, but also seriously affect the personal safety of workers. Therefore, before the plant is put into operation, it is necessary to hire a qualified testing organization to conduct plant quality testing, so as to find out the construction problems in time. What are the items to be inspected when conducting factory quality inspection? First, check the normal operation performance of the plant; Secondly, test its performance and decoration equipment, and check whether it has the ability to deal with safety emergencies.

 


Main contents of inspection plan for steel structure workshop

The inspection items shall be confirmed according to the on-site investigation, and the corresponding inspection scheme shall be formulated. The detection scheme should include the following main contents:

1. Overview, mainly including design basis, structural form, building area, total floors, design, construction and supervision units, and construction unit

2. Test purpose or test requirements of the client

3. Test basis, mainly including the specifications and relevant technical data on which the test is based

4. Test items, selected test methods and quantity

5. Inspection personnel and instruments

6. Inspection progress plan

7. Required cooperation between the client and the testing unit

8. Safety measures in detection

9. Environmental protection measures during testing

Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號